The site of Sheffield castle and the history of it really is an incredible story. Quite simply, this site is where it all began for what is today, one of Britain’s major cities.

This project, and the blueprint put forward by the friends, seeks to reconnect
the city with its past right at the moment that it is increasingly moving forward
With confidence and being reborn as a modern 21st century city. That’s why the
opportunity before us is so exciting.

Tony Robinson

Sir Tony Robinson

Patron of Friends of Sheffield Castle

Play Video

Our blueprint for the site
of Sheffield Castle

Supporting a stunning, high quality redevelopment of Sheffield’s
castle site that interprets this major piece of the city’s history
forms the core of our vision.

Excavations
1/14 videos
1
Excavations - 13/08/2018
Excavations - 13/08/2018
2
Beginning excavations on Sheffield Castle
Beginning excavations on Sheffield Castle
3
Sheffield Castle Dig Preview
Sheffield Castle Dig Preview
4
Wessex Archaeologist's Uncover An Unusual Find
Wessex Archaeologist's Uncover An Unusual Find
5
Sheffield Castle excavations - Week 1
Sheffield Castle excavations - Week 1
6
Sheffield Castle excavations - Week 2
Sheffield Castle excavations - Week 2
7
Sheffield Castle excavations- Week 3
Sheffield Castle excavations- Week 3
8
Sheffield Castle - Week 4 down to the Medieval
Sheffield Castle - Week 4 down to the Medieval
9
Sheffield Castle - Week 5
Sheffield Castle - Week 5
10
Sheffield Castle - Week 6
Sheffield Castle - Week 6
11
Sheffield Castle - Week 7
Sheffield Castle - Week 7
12
Sheffield Castle Week 8
Sheffield Castle Week 8
13
Sheffield Castle - Week 9
Sheffield Castle - Week 9
14
Archaeological Dig
Archaeological Dig
The Bastion

Senior Structural Engineer Steve Mettam sent us some  photographs taken of The Bastion Tower ruins during their pre-demolition surveys in early 2014.

The subterranean ‘low chamber’ is not currently accessible, except via use of harness and winch, by experienced confined spaces trained personnel only. The castle ruins cannot be seen from the new raised ‘lockable’ double triangular surface cover. The square chamber approximately 4m x 4m x 4m deep is experiencing  some groundwater infiltration. We pumped it out once and used infrared heaters to dry it out,  but since the demolition finished at the end of February, it has filled up again now to a depth of 0.5m.

We are trying to determine where the water is coming into the chamber, there is a redundant 300mm dia. service pipe running through it, which we have now CCTV surveyed. I suspect the construction joint between the floor slab and the chamber walls has no waterbar incorporated within it, but the water could also be entering via the surround to the pipe or castle ruins. A survey crew is going to enter the chamber shortly, once we have de-watered it again, to record the chamber’s condition and to try to identify where the groundwater is entering it and we shall make an attempt to ‘stem’ this flow.

Read More